Main Page/work/meetingsarchive
From niccb2b.org.uk
Home > Main Page > Work > Meetings > Meetings Archive
[edit] NICC B2B - Meetings Archive
This page provides access to details of the archive of NICC B2B meetings, agendas, notes and documents discussed at the meetings. Click on the links below to go to the meeting you are interested in and download the documents.
[edit] Meeting 47: High Volume/Calls Billing Interface audio 22 October 2008
- 47.1 Agenda slides & Notes
- 47.2 Price list issues
- 47.3 September/October Progress report
[edit] Meeting 46: High Volume/Calls Billing Interface audio 2 - 9th October 2008
- 46.1 Agenda slides & Notes
- 46.2 Price list issues paper
- 46.3 Backup to ease reconciliation paper
[edit] Meeting 45: High Volume/Calls Billing Interface audio 1 - 11th September 2008
- 45.1 Agenda slides & Notes
- 45.2 Charging and Pricing Scenarios for cPs.doc
- 45.3 NICC B2B August progress report
[edit] Meeting 44: High Volume/Calls Billing Interface workshop 2 - 4th September 2008
- 44.1 Agenda slides & Notes
[edit] Meeting 43: Half year plan & progress review - 27th August 2008
- 43.1 Agenda slides & Notes
[edit] Meeting 42: Service Catalogue & Inventory- 1st August 2008
- 42.1 Agenda slides & Notes
- 42.2 Service Inventory Strawman
- 42.3 NICC B2B July progress report
[edit] Meeting 41: Billing high volume interfaces workshop 1 - 21st July 2008
[edit] Meeting 40: Service Inventory & Catalogue - 9th July 2008
- 40.1 Agenda slides & Notes
- 40.2 Service Inventory & Catalogue Meeting Invite
- 40.3 Service Inventory & Catalogue problem statement
- 40.4 NICC B2B June progress report
[edit] Meeting 39: Appointing and arranging access follow-up & NICC B2B progress review - 23rd June 2008
- 39.1 Agenda slides & Notes
- 39.2 Appointing & Arranging Access requirements
- 39.3 Location & Address Identification Principles
- 39.4 NICC B2B progress report
[edit] Meeting 38: Appointing and arranging access - 12th June 2008
- 38.1 Agenda slides and notes
- 38.2 meeting invite & problem/proposal statement
[edit] Meeting 37: Billing - 21st May 2008
- 37.1 Agenda slides and notes
- 37.2 meeting invite & problem/proposal statement
[edit] Meeting 36: Further L2C & progress review - 7th May 2008
- 36.1 Agenda slides and notes
- 36.2 ND1627: B2B Lead-To-Cash (L2C) Interface Standard document
- 36.3 Progress report for March & April 2008
[edit] Meeting 35: Location & Address identification - 30th April 2008
[edit] Meeting 34: L2C & progress review - 10th April 2008
- 34.1 Agenda/Slides & Notes
- 34.2 NICC B2B Lead-to-cash (L2C)Interface Standard - Draft for review
- 34.3 NICC B2B Trouble-To-Resolve (T2R) XML standard (Generic Schema) formal review version
- 34.4 Updated Service Inventory & catalogue problem statement
- 34.5 Work programme meeting invites
[edit] Meeting 33: L2C & progress review - 26th March 2008
- 33.1 Agenda/Slides & Notes
- 33.2 NICC B2B Trouble-To-Resolve (T2R) XML standard (Generic Schema)
- 33.3 NICC B2B Lead-to-cash (L2C)Interface Standard - Draft for review
- 33.4 Invite to address identification expert group
[edit] Meeting 32: L2C & progress review - 12th March 2008
- 32.1 Agenda/Slides & Notes
- 32.2 Updated problem statements & proposals:
- 32.3 L2C Order construction
- 32.4 L2C user stories, material, etc
- 32.5 T2R user stories, material, Generic Schema, etc
- 32.6 See also all Items open for review on which comments are welcome on the publications pages
[edit] Meeting 31: 2008 Annual Review follow up prioritisation plans & progress - 27th February 2008
- 31.1 Agenda/Slides & Notes
- 31.2 Problem statements & proposals:
- 31.3 L2C activity diagrams
- 31.4 L2C user stories, material, etc
- 31.5 T2R Generic Schema
- 31.6 See also Items open for review on which comments are welcome
- 31.7 Progress Report for Feb 08
[edit] Meeting 30: L2C, T2R, work stack proposals plans & progress - 15th Febrary 2008
- 30.1 Agenda/Slides & Notes
- 30.2 L2C activity diagrams
- 30.3 T2R Generic Schema
- 30.4 Workstack Proposal template
- 30.5 Migrations problem statement & proposal
- 30.6 Address matching problem statement
- 30.7 Service inventory & catalogue problem statement
- 30.8 L2C user stories, material, etc
- 30.9 Other work on address matching and location:
- 30.10 See also Items open for review on which comments are welcome
[edit] Meeting 29: 2008 Annual review - 30th January 2008
- 29.1 Agenda/Slides & Notes
- 29.2 Workstack Proposal template
- 29.3 Migrations proposal
- 29.4 L2C user stories, material, etc
- 29.5 See also Items open for review on which comments are welcome
[edit] Meeting 28: L2C Update plus plan and progress review (28/audio) - 9th January 2008
- 28.1 Agenda/Slides & Notes
- 28.2 L2C order processing terms document
- 28.3 Order Scenario Diargrams
- 28.4 NICC B2B report to TSG Jan 2008
- 28.5 L2C user stories, material, etc
[edit] Meeting 27: L2C Update & Formal NICC B2B (27/audio) - 18th December
- 27.1 Agenda/Slides & Notes
- 27.2 T2R Stuctured Diagnostic Information proposal
- 27.3 NICC B2B report to TSG DEC 2007
- 27.4 Web Site Statistics
- 27.5 L2C user stories, material, etc
[edit] Meeting 26: Review Service ID & Inventory proposals (26/audio) - 28th November
- 26.1 Agenda/Slides & Notes
- 26.2 L2C Service Inventory Proposal
- 26.3 L2C Service Inventory Proposal Slides
- 26.4 L2C user stories, material, etc
[edit] Formal Review Meeting & NICC B2B L2C Development 7 (25/audio) - 21st November 2007
- 25.1 Agenda/Slides & Notes
- 25.2 NICC B2B Generic Trouble Administration XML Interface
- 25.3 L2C order Construction
- 25.4 L2C user stories, material, etc
- 20.5 Progress report to TSG
[edit] L2C User Story Development 6 (24/audio) - 13th November
- 24.1 Agenda/Slides & Notes
- 24.2 L2C user stories, material, etc
[edit] L2C User Story Development 5 (23/audio) - 6th November
- 23.1 Agenda/Slides & Notes
- 23.2 L2C user stories, material, etc
[edit] L2C User Story Development 4 (22/audio) - 31st October 2007
- 22.1 Agenda/Slides & Notes
- 22.2 L2C user stories, material, etc
[edit] L2C User Story Development 3 (21/audio) - 23rd October 2007
- 21.1 Agenda/Slides & Notes
- 21.2 L2C user stories, material, etc
[edit] L2C User Story Development 2 (20/audio) - 19th October 2007
- 20.1 Agenda/Slides & Notes
- 20.2 L2C user stories, material, etc
- 20.3 Progress report to TSG
[edit] L2C User Story Development 1 (19/audio) - 9th October 2007
- 19.1 Agenda/SlidesNotes
- 19.2 L2C user stories, material, etc
- 19.3 NICC B2B documents sent for formal review
[edit] Discussion of ITU proposals (18/audio) - 25th September 2007
- 18.1 Slides & Notes
- 18.2 Briefing on ITU B2B Standards-NICC CPs & next steps v2.doc
- 18.3 Comments on Draft ITU-T Recommendation M.3340
- 18.4 Draft ITU-T Recommendation M.3340
- 18.5 Draft ITU-T Recommendation M.3344
[edit] Formal NICC B2B Review meeting 17 - 13th September 2007
- 17.1 Agenda/Slides & Notes
- 17.2 NICC B2B Process Standards for - T2R v1.2.2
- 17.3 NICC Systems Interface Framework V1.2.1
- 17.4 Issues, next steps Draft17
- 17.5 September Progress Report to NICC TSG
- 17.6 L2C Proposal
[edit] Formal NICC B2B Review meeting 16 - 31st July 2007
- 16.1 Agenda/Slides & Notes
- 16.2 NICC B2B Process Standards for - T2R v0.2n
- 16.3 NICC Systems Interface Framework Draft 0.2a
- 16.4 Issues, next steps Draft10
- 16.5 Progress Report to NICC TSG
- 16.6 Review Request Email
[edit] Meeting T2R update audio - 10th July 2007
- T2R_5.1 Agenda/Slides & Notes
- T2R_5.2 Latest T2R analysis, components, touchpoints, scenarios activity diagrams, etc
- T2R_5.3 Latest User Stories
- T2R_5.4 NICC T2R Process Standard Framework - early draft
- T2R_5.5 Progress Report to NICC TSG
[edit] C&W Workshop - 6th July 2007
[edit] Meeting T2R Progress 4 - 26th June 2007
- T2R_4.1 Agenda/Slides & Notes
- T2R_4.2 spreadsheet with "touch-point components” and “process scenarios”
- T2R_4.3 slides with “swim-lane Activity Diagrams"
- T2R_4.4 Latest User Stories
[edit] Meeting T2R Progress 3 - 19th June 2007
- T2R_3.1 Agenda/Slides & Notes
- T2R_3.2 spreadsheet with "touch-point components” and “process scenarios”
- T2R_3.3 slides with “swim-lane Activity Diagrams"
- T2R_3.4 Latest User Stories
[edit] Meeting T2R Progress 2 - 12th June 2007
- T2R_2.1 Agenda/Slides & Notes
- T2R_2.2 spreadsheet with "touch-point components”, “process scenarios” and “swim-lane Activity Diagrams" (to follow)
- T2R_2.3 CP Workshop Agenda
- T2R_2.4 Progress report to NICC TSG
- T2R_2.5 Latest User Stories
[edit] Meeting T2R Progress 1 - 5th June 2007
- T2R_1.1 Agenda/Slides & Notes
- T2R_1.2 Latest User Stories
- T2R_1.3 NICC Process Standards Framework Template
- T2R_1.4 CIO Event Brief
[edit] Meeting User Story Development 4 - 16th May 2007
- US4.1 Agenda/Slides & Notes
- US4.2 User Stories
[edit] Meeting User Story Development 3 - 9th May 2007
- US3.1 Agenda/Slides & Notes
- US3.2 User Stories
[edit] Meeting User Story Development 2 - 2nd May 2007
- US2.1 Agenda/Slides & Notes
- US2.2 User Stories
[edit] Meeting User Story Development 1 - 25th April 2007
- US1.1 Agenda/Slides & Notes
- US1.2 User Stories
- US1.3 Comms Plan T2R Process Development D1.doc
- US1.4 NICC B2B Stakeholder Analysis Draft v0.3b.doc
- US1.5 NICC Process Standards Framework Template D1.doc
[edit] Meeting 6 - 17th April 2007
Documents for review & agreement [Document Ref] (NB if there is no link the document is still being drafted):
(Stage 1): To note documents agreed for publication
- 6.2 Trouble-to-Resolve (T2R) Process [7.1a]
- 6.3 User Story Approach [1.5]
(Stage 2) NICC B2B to review/agree :
- 6.4 Stakeholder Analysis [1.3]
(Stage 3) Review of the core work stack / plan & progress
- 6.5 Work Plan & Progress report [9.1]
(Stage 4) NICC B2B to accept for development:
- tba new proposals
Other Material
- 6.4 Updated & issued notes of Meeting 5a for action review
- 6.5 Slides used at meeting
- 6.6 ZIP file with all Meeting 6 documents
[edit] Meeting 5a: T2R Check Point Audio / Webinar - 20th March 2007
Documents for review & agreement [Document Ref] (NB if there is no link the document is still being drafted):
- 5a.2 Trouble-to-Resolve (T2R) Process White Paper - Issue 1 [7.1a]
- 5a.3 User Story approach - Draft 2g [1.5]
- 5a.4 C&W User Story
- 5a.5 BT User Stories
- 5a.6 Slides used during the meeting
- 5a.7 ZIP file with all Meeting 5CP documents
[edit] Meeting 5 - 1st March 2007 (Webinar see agenda for details)
Documents for review & agreement [Document Ref] (NB if there is no link the document is still being drafted):
(Stage 1): To note documents agreed for publication
- 5.2 NICC B2B Framework Document[1.6]
- 5.3 NICC B2B Requirements - Issue 2 [2.2]
(Stage 2) NICC B2B to review/agree :
- 5.4 Work plan(Study Item No 66)- Issue 3 [1.2]
- 5.5 User Story approach - Draft 2 [1.5]
(Stage 3) Review of the core work stack / plan & progress ]
- 5.6 Trouble-to-Resolve (T2R) Process White Paper - Issue 1 [7.1a]
- 5.7 Lead-to-Cash (L2C) Process White Paper - Draft 1 [7.1b]
- 5.8 Jan/feb progress report & resource plan for NICC TSG [9.1]
(Stage 4) NICC B2B to accept for development:
- None
Other Material
- 5.9 Updated & issued notes of Meeting 4 for action review
- 5.10 Slides used at meeting
- 5.11 ZIP file with all Meeting 5 documents
[edit] Meeting 4 - 26th January 2007
- 4.1 Agenda & [1b TSG_B2B-CP 3(06)17 NICC B2B Meeting 4 Notes D2 .doc Notes ]
Documents for review & agreement [Document Ref] (NB if there is no link the document is still being drafted):
(Stage 1): To note documents agreed for publication
- 4.2 Architecture principles [4.1]
- 4.3 Template Deployment Profile For ebXML [4.2]
- 4.4 NICC B2B Terms of Reference [1.1]
- 4.5 Best Practice approach [1.4]
(Stage 2) NICC B2B to review/agree :
- 4.6 Work plan (NICC study Item No 66)[1.2]
- 4.7 Stakeholder analysis [1.3]
- 4.8 Use case approach [1.5]
- 4.9 NICC B2B Framework Document [1.6]
(Stage 3) Review of the core work stack / plan & progress
- 4.10 NICC B2B Requirements [2.1]
- 4.11 December Progress Report [9.1]
(Stage 4) NICC B2B to accept for development:
- none
Other Material
- 4.12 Updated & issued notes of Meeting 3 for action review
- 4.13 Slides used at meeting
- 4.14 ZIP file with all Meeting 4 documents
[edit] Expert Group Meeting 1 - 12th January 2007
- EG 1.1 Agenda
- EG 1.2 Notes
- EG 1.3 NICC B2B Requirements
[edit] ITU meetings - held 7th, 14th & 15th December 2006
Three audios were held in December to discuss UK CP's comments on the "Draft new ITU-T Recommendation M.3343 : Requirements and Analysis for NGN Trouble Administration across B2B and C2B interface". The relevant documents and notes can be downloaded below.
[edit] Meeting 3 - 21st November 2006
- 3.1 Agenda
Documents for review & agreement [Document Ref] (NB if there is no link the document is still being drafted):
- 3.2 NICC B2B Terms of Reference [document ref 1.1]
- 3.3 B2B Work Plan (Study Item No 66) [1.2]
- 3.4 Stakeholder analysis [1.3]
- 3.5 Best Practice approach [1.4]
- 3.6 Use case approach [1.5] - see Meeting slides
- 3.7 Framework document [1.6]
- 3.8 NICC B2B Architecture principles [4.1]
- 3.9 NICC B2B Template Deployment Profile For ebXML [4.2]
- 3.10 NICC B2B Use Cases proposals [5.2] - See Meeting slides
- 3.11 NICC B2B Technical Data Dictionary proposals [5.3] - see Meeting slides
- 3.12 NICC B2B Requirements [2.1]
- 3.13 Progress report to TSG [9.0]
- 3.14 Notes for previous meeting 2
Other Material
- 3.15 Meeting slides
- 3.16 SDK slides
- 3.17 Notes for meeting 3
- 3.18 Location White paper
- 3.19 ZIP file with all Meeting 3 documents
[edit] Meeting 2 - 20th October 2006
- 2.1 Agenda - TSG/B2B-CP 2(06)1
- 2.2 Notes - TSG/B2B-CP 2(06)2
- 2.3 Slides from meeting
- 2.4 Draft Terms of Reference - TSG/B2B-CP 2(06)3
- 2.5 Draft Work Item - TSG/B2B-CP 2(06)4
- 2.6 ZIP file with all Meeting 2 documents
[edit] Meeting 1 - 18th September 2006
- 1.1 Agenda to first meeting - TSG/B2B-CP 1(06)1
- 1.2 NICC IT systems interface (B2B) framework document – TSG/B2B-CP 1(06)2
- 1.3 Template Deployment Profile For EBXML Messaging Service 2.0 Gateways In UK Telecoms – TSG/B2B-CP 1(06)3
- 1.4 Notes of first meeting - TSG/B2B-CP 1(06)4
- 1.5 Draft Terms of Reference
- 1.6 Slides
- 1.7 Draft new ITU-T Recommendation M.3343 : Requirements and Analysis for NGN Trouble Administration across B2B and C2B interface
- 1.8 BT Comments on M.3343
- 1.9 Progress report to TSG
- 1.10 ZIP file with all Meeting 1 documents
[edit] Pre-Meeting - 26th July 2006
- 0.1 Notes
- 0.2 Slides
- 0.3 Proposal to re-establish NICC B2B group
-- GrahamCrane - 03 March 2009
